I drive past at 9:15 and the boys are having a break waiting for the truck to catch up. It looks as if the concrete pouring is half done. When I return in the late afternoon the concrete feels hard to touch. A piece of pipe dug up when the Toby box was moved is sitting on the grass- it's munted.
No comments:
Post a Comment